Charlotte-Mecklenburg Police Department
Charlotte, NC | 25,000 SF
One challenge with this project was to design a geothermal mechanical system that required the 48 wells to be dug on the 2.5 acre site which required an underground detention system. The series of wells and the different loops of piping was a challenge with the limited amount of open site area.