OOne challenge with this project was to design a geothermal mechanical system that required the 48 wells to be dug on the 2.5 acre site which required an underground detention system. The series of wells and the different loops of piping was a challenge with the limited amount of open site area.
Client
Charlotte-Mecklenburg Police Department
Location
715 N Wendover Rd
Charlotte, NC 28206
25,000 SF
$3,254,751
Mike Bedard
Division Supervisor
601 East Trade Street
Charlotte, NC 28202
704.488.9435
David A. Creech, AIA, NCARB
Principal-In-Charge
Brent J. Green, LEED AP
Designer/Project Manager
John M. Crawford, CDT, CSI
Construction Administration